(1) Commissioned project by Southern University of Science and Technology (Intelligent storage layout optimization and resource scheduling development Demonstration)
(2) Industry-University-Research Project of Jiangsu Provincial Science and Technology Department (Integrated Vehicle Storage Process Optimization Based on Intelligent Storage Location Matching)
(3) Commissioned project by CMSCL (optimization of integrated vehicle warehousing process based on intelligent warehouse location matching)
(4) Commissioned project by CMSCL (Intelligent loading and line optimization system)
(5) The National Natural Science Foundation of China (Study on Batch Scheduling Considering Energy Efficiency and Algorithm Design)
(6) The National Science Foundation for Post-doctoral Scientists of China (Green Manufacturing: Theory and Method of Energy Saving Batch Scheduling Optimization)
(7) The National Science Foundation for Post-doctoral Scientists of China (Study on Batch Dispatch Problem and Design of Algorithm in Flow Shop Environment)